Preparing for pop top: where to run conduit?

Nalgene

New Member
I’m planning out my build and whilst I keep hearing to do the cutting first i.e. windows and pop top, I’m worried about where the pop top will block off from being able to run my wiring.

I’ll be getting a skyline aurora fitted but I want to run some conduit in advance of the pop top going in, can anyone tell me where I can run it?
 
I’d ask the installers of the roof as they’ll probably know the best place for it.
 
If you already know what you want running in there we wouldn't see any issue with a customer running cabling alongside the factory loom on the N/S and some on the O/S. you could always run a couple of extra twin cores if it's sockets etc you're concerned about missing? We install a 1mm single core into our fitting frames with a small piece of tape either end that you can break off. Hidden when converted but really useful if anything else needs running as a pull wire
 
Back
Top