Hi all,
Can anyone clarify when a standard step can be used and when a caravelle step is needed please.
T6 SWB, stripped back to bare floor. I'm fitting 9mm packers but then I can't suss out what I need next with regard to thickness of sound deadening and ply.
I see a lot of people just use deadening with no thermo liner, and other converters who say they dont bother to insulate underneath the floor at all.
What is the standard these days?
Ultimately want to end up with the step sitting on top of the vinyl covered ply floor.
Thanks in advance
Can anyone clarify when a standard step can be used and when a caravelle step is needed please.
T6 SWB, stripped back to bare floor. I'm fitting 9mm packers but then I can't suss out what I need next with regard to thickness of sound deadening and ply.
I see a lot of people just use deadening with no thermo liner, and other converters who say they dont bother to insulate underneath the floor at all.
What is the standard these days?
Ultimately want to end up with the step sitting on top of the vinyl covered ply floor.
Thanks in advance
Last edited: