Coming to start the van floor and just confused on which process to go with.
I have a one piece 12mm floor and 9mm batons.
Do I stick the 9mm batons down first and go over the whole lot with Dodo Mat DEADN Duo and then the 12mm floor on top?
Or
Glue 9mm batons down first and then Dodo Mat DEADN Duo between the gaps then put the floor down?
Or doesn't it really matter?
Any advice will be much appreciated.