Morning all, so I have my panel fitted to the roof and I was going to run the wires for it today, I have cut the hole for my entry gland and I was originally going to cut the supplied connectors off then feed the cable through and add some new connectors inside the roof so it looks a bit neater.
But questions: being that the panel is generating electricity am I going to get a shock if I try and cut them down?! If so anything I can do about that?
Or do I leave the cables long and just leave the connectors on the roof and run my extension cable down through the gland?
Thoughts/ help greatly welcomed!!
Pic as it is now:
But questions: being that the panel is generating electricity am I going to get a shock if I try and cut them down?! If so anything I can do about that?
Or do I leave the cables long and just leave the connectors on the roof and run my extension cable down through the gland?
Thoughts/ help greatly welcomed!!
Pic as it is now: