So I am taking out my rubber floor and put a 12mm ply down, I don't need the tie down anchor points. I have had a bed system installed for the last few years so haven't got ant bolts for the now vacant holes in the tie down points.
Guessing I can just get some M10 x 16mm bolts and put in the vacant holes, secure with Loctite and a rubber washer and that should stop water ingress?
Guessing I can just get some M10 x 16mm bolts and put in the vacant holes, secure with Loctite and a rubber washer and that should stop water ingress?