Thread moved ;-)
Here are some pictures of where I am currently at with build. I have had the air con and windows fitted by a company as will all the Victron goodies which go in on Tuesday next week (3kw and 320ah battery with additional room for a second 320ah if need). All the boards were CNC’ and fitted by me.
I will eventually get round to posting a list of all the things that I have bought as out of the build
And a few more
Last edited by a moderator: