T6.1 new order delays

Panel or Kombi? If Kombi you should go through as class 4. My T32 had its first mot about a month ago, the garage were a little stumped at first so made a call to whoever at DVSA and it was completed as class 4.
Kombi , the mot like you said it no bother. It was really only down to the wheels and tyres
 
Rare video footage of leaky window man, distinguishable by the silly hat he wears. Its perforated so he can feel the drips of success on his swede!
 
Rare video footage of leaky window man, distinguishable by the silly hat he wears. Its perforated so he can feel the drips of success on his swede!
I want a pair of those leaky window man dungarees!

It did explain why production is low. In all that that film not one person was actually working on a van!
 
Rare video footage of leaky window man, distinguishable by the silly hat he wears. Its perforated so he can feel the drips of success on his swede!
That almost exactly how I expected him to look!!
I want a pair of those leaky window man dungarees!;)

It did explain why production is low. In all that that film not one person was actually working on a van!

Thats because most of their day is spent discussing Covid protocols! :eek:
 
My van has finally been built. Ordered 199 T32 combi with all the options mid September. Was told a week or so ago that it was provisional build week mid April. Got a call today today to say its been built and its a 204.
Same vehicle ordered August 18th, still nothing, albeit LWB, 4m, DSG.
 
I must have ordered someting obscure told back to provisional week 18 yesterday. P1ngu van looks the dogs danglies.
 
Thanks Woodman, very happy with it. It feels very up market compared to my similar spec 5.1. It's a barn door kombi which I was told when ordering is slightly unusual, but otherwise fairly basic options ticked. Hope you get a bit more clarity on your order soon.
 
Those quotes of 14-16 weeks just seem like the standard flannel at point of order. That’s was I was told on order number 1 in Sept (and also in black and white on order form). 20 weeks later I didn’t even have a provisional build date and then of course it got cancelled in week 21.

When I was ringing around for order number 2, guess what I was told ......14-16 weeks, which I queried based on experience and feedback here. They didn’t budge, 14-16 weeks they insisted. So glad I hijacked an existing stock order, otherwise I’d still be waiting for a provisional date again, and probably being updated that it might be September.

But I wish you luck @Wilo
Do you know where your van is this week @Ozi ?
Mine is still waiting at Emden
 
Good question @Randolph. When I spoke to the dealer last week, he was expecting it to land in Sheerness over the weekend. As of this morning VW chat still thinks it’s in Emden, and allegedly say it is now assigned to a ship, but not yet on it. Couldn’t tell me which ship or when though - only the factory know that apparently as they arrange it.

Been sat there for 14 days if that’s correct, which they say is due to bad weather having delayed transport by sea. First time that’s been mentioned, and the run from Emden to Sheerness has been constant for the last two weeks, as have other shipping routes out of Emden. So that’s either a historic issue which has caused a backlog, which I guess is possible over the winter, or it’s just another VW random excuse.

Waiting to see what the dealer comes back with. Based of history, it’s quite possible it’s actually now sitting at Sheerness and VW chat are behind the curve again. I console myself with the fact that it is actually built!
 
Good question @Randolph. When I spoke to the dealer last week, he was expecting it to land in Sheerness over the weekend. As of this morning VW chat still thinks it’s in Emden, and allegedly say it is now assigned to a ship, but not yet on it. Couldn’t tell me which ship or when though - only the factory know that apparently as they arrange it.

Been sat there for 14 days if that’s correct, which they say is due to bad weather having delayed transport by sea. First time that’s been mentioned, and the run from Emden to Sheerness has been constant for the last two weeks, as have other shipping routes out of Emden. So that’s either a historic issue which has caused a backlog, which I guess is possible over the winter, or it’s just another VW random excuse.

Waiting to see what the dealer comes back with. Based of history, it’s quite possible it’s actually now sitting at Sheerness and VW chat are behind the curve again. I console myself with the fact that it is actually built!
Thanks @Ozi that gives me some explanation for mine being there for 2 weeks.
 
And the Mallaca Highway is just returning to Emden from Sheerness. It seems to run a constant 3 times a week run between the two, and always returns to Emden empty, so appears to be delivery to Uk only. So I'm sure it will turn up soon...I hope!
 
Back
Top