All going well but had to re drill a few holes for the fixings as a few didn’t line up. Also my LWB hasn’t got the floor lash downs in the correct place so had to take up the rubber floor to find them. Once I done that I had to puncture the rubber floor mat and also the Ovano holes don’t line up so had to re drill those too. A bit of a ball ache but after searching online for instructions to build the damn thing it’s all in!